欧美色老大,神马不卡国产精品18,成人1314在线网,亚洲AV成人精品网站在线演者

文章詳情

i1000d U9401

日期:2024-12-29 00:11
瀏覽次數(shù):2103
摘要:

i1000d U9401
Before you begin installation, prepare the power cable for the system.
Refer to the instructions
incontinue with the installation procedure for your system:
. Installation Procedure for Press Down Model (U940IA)
~ Installation procedure for Vacuum Model (U9402A)
Installation Procedure for Press Down Model (U940IA)
1  Install the Press Down Unit (U940IA)
2  Install the Controller
3  Connect the Debug Probe
4 Connect Power and Compressed Air Supply
5 Power Up the System
6  Install Medalist il000 Software
7  Install the Fixture
8 Align the Safety Sensors
9  Perform a System Check
Installation procedure for Vacuum Model (U9402A)
1  Install the Controller
2 Connect the Debug Probe
3 Connect Power and Compressed Air Supply
4 Power Up the System
5  Install Medalist il000 Software
6  Install the Fixture
7  Perform a System Check
Medallist  i1000  InStalia~tion  Guzde
Preparing the Power Cord

The Medalist il000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
To assemble the power cord, follow these steps:
1    Locate  the  power  connector  provided fFigur e  8)
Figure 8   Power connector
2 Loosen the two screws holding the cable retainer at the back of the
   power connector. Then unscrew the black connector insert to separate
    it from the metal casing(fg_:-o :-.).
Figure 9   Remove black connector insert
Medealist i1000  Instaallation  G uidp
3 Strip the insulation
power cord through
(Figure 10).
of the power cord to expose the wires. Insert the
the metal casing of the power connector
Figure 10   Strip power cord and insert in connector
4  Solder the wires to the correct terminals on the connector insert. The
   terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
Ensure the wires are connected to the correct terminals as shown in
            .. Otherwise the system could be damaged.
Figure 11   Solder wires to terminals
Me d allist  il 000  InStaliation  Guade
i1000d U9401
 

精品国产天堂综合一区在线| 成人无码AV一区二区三区| 久久久久x国产精品| 日本韩国一级免费在线观看| 国产精品一区色欲网| 亚洲精品无码福利片| 91久久人澡人人添人人爽人人 | 久久精品一| 久久播放亚洲AV| 99永久视频在线观看免费| 无码精品A∨在线观看无| 亚洲国产精品美乳后入内射录像带| 久久丫国产亚洲AV| 亚洲色永久大成www网站| 性色AV免费一区二区三区| 亚洲精品日韩精品| 久久伊人热视频| 久久精品国产精品浪潮AV| 爱爱日本岛国| 久久久免费黄色三级片| 激情视频一区二区三区| 午夜福利影院一区二区三区| 日韩网站观一下| 一区二区三区久久精品视频| 午夜丁香欧美激| 国产精品人人P| 在线观看免费人成视频| 中文黄片免费视频| 久久99热久久99精品| 五月丁香六月日逼| 99国产欧美久久久精品色欲| 精品免费久久久久久久中文| 在线观看日本一区二区| 成人H免费视频| 国产成人AV一区二区三区不卡| 亚洲精品成AV人片天堂无码| 久久汅视频69| 亚州一区二区三区AV| 久久精品视频99精品| 免费观看a级片| tube8麻豆天美|