欧美色老大,神马不卡国产精品18,成人1314在线网,亚洲AV成人精品网站在线演者

文章詳情

i1000d U9401

日期:2025-07-02 03:40
瀏覽次數(shù):2155
摘要:

i1000d U9401
Before you begin installation, prepare the power cable for the system.
Refer to the instructions
incontinue with the installation procedure for your system:
. Installation Procedure for Press Down Model (U940IA)
~ Installation procedure for Vacuum Model (U9402A)
Installation Procedure for Press Down Model (U940IA)
1  Install the Press Down Unit (U940IA)
2  Install the Controller
3  Connect the Debug Probe
4 Connect Power and Compressed Air Supply
5 Power Up the System
6  Install Medalist il000 Software
7  Install the Fixture
8 Align the Safety Sensors
9  Perform a System Check
Installation procedure for Vacuum Model (U9402A)
1  Install the Controller
2 Connect the Debug Probe
3 Connect Power and Compressed Air Supply
4 Power Up the System
5  Install Medalist il000 Software
6  Install the Fixture
7  Perform a System Check
Medallist  i1000  InStalia~tion  Guzde
Preparing the Power Cord

The Medalist il000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
To assemble the power cord, follow these steps:
1    Locate  the  power  connector  provided fFigur e  8)
Figure 8   Power connector
2 Loosen the two screws holding the cable retainer at the back of the
   power connector. Then unscrew the black connector insert to separate
    it from the metal casing(fg_:-o :-.).
Figure 9   Remove black connector insert
Medealist i1000  Instaallation  G uidp
3 Strip the insulation
power cord through
(Figure 10).
of the power cord to expose the wires. Insert the
the metal casing of the power connector
Figure 10   Strip power cord and insert in connector
4  Solder the wires to the correct terminals on the connector insert. The
   terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
Ensure the wires are connected to the correct terminals as shown in
            .. Otherwise the system could be damaged.
Figure 11   Solder wires to terminals
Me d allist  il 000  InStaliation  Guade
i1000d U9401
 

av波多野结衣一区二区三区| 免费人成无码视频在线观看| AV无码HD| 久久久久无码人妻一区二区三区| 特黄在线观看av| 成人精品动漫h无码| 夜色福利一区二区三区| 日韩大香蕉久久播爱| 麻豆国内精品久久久久久| 日本韩一级二级三级| 欧美亚洲第一精品久久| 亚洲精品一区二区三区| 麻豆国产人免费人成免费视频| 人妻无码免费| 国产又猛又色的网站| 日韩精品黄色av| 久久婷婷五月综合色一区二区| 无码 在线观看免费| 丁香五月婷久久| 十八禁男女啪啪免费视频 | 无码专区天天躁天天躁在线| 在线免费看a| 成人AV鲁丝片一区二区免费| 国产三级精品久久久久 | wwwxxx国产免费| 囗爆Av| 亚洲影视综合网| 国产真实乱子伦精品视频| 精品国产自在在线午夜精品| 亚洲欧美精品日韩| www无码| 色 亚洲欧美一| 老司机午夜精品99久久免费 | 最新午夜国内自拍视频| 久久无码视频专区| 亚洲精品在线播放器| 日韩成人电影在线一区| 婷婷五月激情久久av无码| 中文字幕中亚洲视频| 男女啪啪十八禁国| 欧美牲交A欧美牲交aⅴ图片|