欧美色老大,神马不卡国产精品18,成人1314在线网,亚洲AV成人精品网站在线演者

文章詳情

i1000d U9401

日期:2024-12-29 00:11
瀏覽次數(shù):2103
摘要:

i1000d U9401
Before you begin installation, prepare the power cable for the system.
Refer to the instructions
incontinue with the installation procedure for your system:
. Installation Procedure for Press Down Model (U940IA)
~ Installation procedure for Vacuum Model (U9402A)
Installation Procedure for Press Down Model (U940IA)
1  Install the Press Down Unit (U940IA)
2  Install the Controller
3  Connect the Debug Probe
4 Connect Power and Compressed Air Supply
5 Power Up the System
6  Install Medalist il000 Software
7  Install the Fixture
8 Align the Safety Sensors
9  Perform a System Check
Installation procedure for Vacuum Model (U9402A)
1  Install the Controller
2 Connect the Debug Probe
3 Connect Power and Compressed Air Supply
4 Power Up the System
5  Install Medalist il000 Software
6  Install the Fixture
7  Perform a System Check
Medallist  i1000  InStalia~tion  Guzde
Preparing the Power Cord

The Medalist il000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
To assemble the power cord, follow these steps:
1    Locate  the  power  connector  provided fFigur e  8)
Figure 8   Power connector
2 Loosen the two screws holding the cable retainer at the back of the
   power connector. Then unscrew the black connector insert to separate
    it from the metal casing(fg_:-o :-.).
Figure 9   Remove black connector insert
Medealist i1000  Instaallation  G uidp
3 Strip the insulation
power cord through
(Figure 10).
of the power cord to expose the wires. Insert the
the metal casing of the power connector
Figure 10   Strip power cord and insert in connector
4  Solder the wires to the correct terminals on the connector insert. The
   terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
Ensure the wires are connected to the correct terminals as shown in
            .. Otherwise the system could be damaged.
Figure 11   Solder wires to terminals
Me d allist  il 000  InStaliation  Guade
i1000d U9401
 

国产精品久久久久久久久无码蜜臀| 一本色道久久国产日韩Av| 欧洲精品免费视频| 五月激情婷婷九九| 日韩人妻AV电影| 激情图在线| 中文字幕在线亚洲二区| 后入二区| 午夜中文字幕| 国语自产精品视频在线观看| 天天色熟女| 色棕色天天综合网| 免费国产午夜高清在线视频| 麻豆视频一区二区在线观看| www.色六月| 日韩欧美人妻激情小说| 在线观看欧美日韩亚洲中字国产| 国产福利小视频在线观看| 亚洲精品乱字幕| 日本真人强奷动态图试看30秒| 亚洲色噜噜视频| 中文在线字幕一网| 丁香五月综合在线| 丁香九月激情啪啪| 欧美激情一区二区久久| 亚洲91在线97| 久久久久无码精品国产a不卡| 日韩午夜高清视频| 久久不见久久见中文字幕免费| 国产精品日韩成人| 人妻bt| 亚洲国产精品无码久久无码 | 国产精品77777| 亚洲AV成人无码乱码精品| 手机在线观看你懂的| 国产乱伦大奶子| 东京热av一区二区不卡| 亚洲不卡欧美www| 亚洲А∨天堂AV网在线| 欧美日本久久久久| 688欧美人禽杂交狂配|